Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

July 2012

Sun Mon Tue Wed Thu Fri Sat
1
2
3
4
5
6
7
 
ER-2 - AFRC #809: 809 - Functional Check Flight
 
 
 
 
 
 
8
9
 
ER-2 - AFRC #809: Pilot Prof - 2.5 hrs
 
ER-2 - AFRC #809: Pilot Prof 0.5 hrs
 
ER-2 - AFRC #809: Superpod Install 2012-07-10 - 2012-07-11
 
ER-2 - AFRC #806: 600 hr Phase Inspection 2012-07-12 - 2012-12-14
»
 
 
 
 
 
« ER-2 - AFRC #806: 600 hr Phase Inspection 2012-07-12 - 2012-12-14
»
 
ER-2 - AFRC #809: Upload PACS & AirMSPI
 
ER-2 - AFRC #809: PACS/AirMSPI Flight
 
ER-2 - AFRC #809: PACS/AirMSPI Flt (2hrs)
 
 
ER-2 - AFRC #809: PACS/AirMSPI Flight
 
ER-2 - AFRC #809: PACS/AirMSPI Flt (2hrs)
 
 
 
« ER-2 - AFRC #806: 600 hr Phase Inspection 2012-07-12 - 2012-12-14
»
 
ER-2 - AFRC #809: Install CCMP Engine 2012-07-23 - 2012-08-03
»
 
 
 
 
 
 
1
2
3
4
« ER-2 - AFRC #806: 600 hr Phase Inspection 2012-07-12 - 2012-12-14
»
« ER-2 - AFRC #809: Install CCMP Engine 2012-07-23 - 2012-08-03