Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

HS3 09/12/14 Mission Daily Schedule

Overview:  AV-6 Science Flight #5 landed this evening at 1749 EDT. During the flight, TD06 was upgraded to TS Edouard by the NHC. 64 sondes were deployed over the course of the 25-hr flight.
 
Mission Science is currently looking at both Sat evening and Sun morning takeoff options depending on local weather. Update at 0800 Saturday.
 
Note: AV-6 Instrument Postflight was shifted back two hours to 0900 Saturday.
 
Sat Sep 13 (potential evening takeoff for Science Flight #6)
WFF (EDT)
   -  0800 Forecast Briefing (S115)
   -  0800 Computer Scans
   -  0900 AV-6 Instrument Postflight/Preflight
   -  1930 Forecast Briefing (S115)
If the flight is Sat evening:
-  1645 Staff GHOCE
-  1715 AV-6 Engine Start
-  1800 AV-6 Takeoff
 
Sun Sep 14 (potential morning takeoff for Science Flight #6)
WFF (EDT)
   -  0800 Forecast Briefing (S115)
   -  1930 Forecast Briefing (S115)
If the flight is Sun morning:
-  0545 Staff GHOCE
-  0615 AV-6 Engine Start
-  0700 AV-6 Takeoff