OIB 10/21/16 Mission Daily Schedule

Plan of The Day
< 1100 Aircraft Power ON
1400 - 1500 PUQ Airport Fire Drill (see Notes)
1810 - Science Meeting, at the Sky Bar
 
Notes & Reminders:
 

  • Fire Drill today at 1400 - 1500: Except the two DC-8 aircraft fire watches everyone else needs to evacuate to the parking lot in front of the terminal.
  • NEW PRINTER: We have installed a new wireless printer in the OIB ops area. Please delete the old one (EPSON XP-400) and add the new one (EPSON L375 Series). This printer has higher printing capacity and hopefully presents few issues. You DO need to download drivers for it, you can either use the CD located by the printer or go to https://epson.cl/Soporte/Impresoras/Impresoras-multifuncionales/Epson-L/... and select [DOWNLOAD] for the [Driver de Impresora v9.81] (for the case of Mac computers, it might be different for Windows machines. As usual, if necessary, ask ESPO for assistance setting it up.
  • ESPO: Jhony is leaving on Saturday and will be back here on November 10th to wrap up the campaign, please take the opportunity to say thank you. Patricio Ibarra and I will still be here. My US cell phone number is +1 (925) 640-0463, my local, Chilean mobile: +56 9 9688-8264. Patricio phone is +56 9 9190-3874. Remember that the local OIB Office phone is +56 9 7836-9688.
  • MTS: To access MTS: https://mts.nasa.gov/group/operation-ice-bridge