Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.
The T-39 transited from Langley, Va to Salina, Ks.
Weather Conditions from Site Operators Log
High broken cirrus throughout the day, joined by scattered Stratocumulus around 13:00 UTC. Moderate winds (10 mph) from the south become stronger (20 mph) coming from the southwest. This causes light to moderate blowing dust increasing from 15:00 to 19:00.
Key: O = operational, X = down or degraded
There are four staffed Boundary Facilities, each having Balloon Borne Sounding Systems (BBSS) and MicroWave Radiometers (MWR). During the IOP period, sondes are launched every three hours round the clock, starting at 5:30 GMT (12:30 CST). The sites are listed below. Times listed following a site indicate questionable data or failed sonde launches. Weather conditions are recorded in the Boundary Facilities Site Operator's Log.
There are numerous unstaffed Extended Facilities. The specific instrumentation at the extended facilities varies from site to site, but generally includes a flux station (either an Energy Balance Bowen Ration (EBBR) system or an Eddy Correlation (ECOR) system), a Solar and InfraRed Observing System (SIROS), and a Standard Meteorology Observing Station (SMOS) tower. For the locations of the Extended Facilities, and their suite of instrumentation, see the table and map of the Extended CART site. The comments below indicate specific data streams with identified problems.