Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.
NASA – ASIA-AQ Plan of the Day
Wednesday, December 20, 2023 (all times are PT)
0700 - 1800: ESPO / AFRC on Deck
NASA DC-8
0700: Aircraft Access Begins
1300: Instrument Team Tag-Up in S111
1330: Egress Training
1700: Aircraft Access Ends
Notes:
1. The Visitor Control Center (VCC) hours Mon – Fri 0700 – 1530
2. Please refer to the ASIA-AQ Palmdale Deployment Guide for information
3. WhatsApp groups: General Announcements; ASIA-AQ Foreign Escorts; and ASIA-AQ Fun
4. Dec 22: Toolsets and Spares (TS-1) air shipment AFRC to Philippines
4. Make sure to book your hotel rooms for the transit and deployment sites - don’t delay
Hilton Clark Sun Valley Resort reservation link: https://shorturl.at/gjtz9
Please use the WhatsApp FNE group to coordinate with your escorts.
Escorts, please coordinate with other escorts if you need to switch FNs/dates/times.
AFRC and ESPO can assist with movement between the different locations.
Escorts are required in the lab, breakroom and on the DC-8 and movement between locations within the facility 7-days a week - no exceptions.
Escorts are available Monday through Friday during DC-8 access hours. Support outside these times require pre-coordination with ESPO.