ATom

Synonyms
Atmospheric Tomography Mission
ATom 04/02/18 Mission Daily Schedule
Friday, March 30 Accomplishments
  • GT-CIMS, NOAA CIMS, CIT-CIMS, and WAS are flight ready. The DC-8 is fully integrated for ATom-4.
Week of 4/2 - 4/6
  • Beginning Saturday: CIT-CIMS daily LN2 servicing in the morning
  • Monday, April 2: A/C outside for testing. No A/C access except for CalTech LN2 servicing.
  • Tuesday, April 3: W&B/cabin pressure tests. No A/C access during tests.
  • Wednesday, April 4: AFRC Safety Stand Down Day. No A/C access all day (except for LN2 servicing).
  • Thursday, April 5: A/C access from 06:00 - 15:30
  • Friday, April 6: Possible RVSM recertification/pilot proficiency flight. Contact Tim Moes for details.
Week of 4/9 - 4/13
  • Monday, April 9: A/C access from 06:00 - 14:30. Prof flight after access closes.
  • Tuesday, April 10: Test Flight #1
  • Wednesday, April 11: A/C access from 06:00 - 17:30
  • Thursday, April 12: Test Flight #2
  • Friday, April 13: Media Day
ATom 03/29/18 Mission Daily Schedule
Thursday, March 29 Accomplishments
  • GT-CIMS, NOAA CIMS, and CIT-CIMS installed and power checked
  • PANTHER/UCATS running instruments in lab
Friday, March 30 Plan
  • WAS to continue integration
  • 06:00 - 09:00: A/C outside for testing. Access to the a/c is available at this time, but bring ear protection - the testing will be loud.
  • 09:00 - 16:30: A/C access inside hangar
  • 13:00: Daily brief in lab
Next week
  • Beginning Saturday: CIT-CIMS daily LN2 servicing in the morning
  • Monday, April 2: A/C access from 06:00 - 15:30
  • Tuesday, April 3: W&B/cabin pressure tests. No A/C access during tests.
  • Wednesday, April 4: AFRC Safety Stand Down Day. No A/C access all day.
  • Thursday, April 5: A/C access from 06:00 - 15:30
  • Friday, April 6: Possible flight activity. Contact Tim Moes for details.
ATom 03/28/18 Mission Daily Schedule
Wednesday, March 28 Accomplishments
  • WAS racks on aircraft
  • GT-CIMS powered on aircraft, running lines to cylinder rack
  • NOAA CIMS and CIT-CIMS finishing up integration, testing on aircraft
  • MMS working on software
  • PANTHER/UCATS running instruments in lab
Thursday, March 29 Plan
  • 06:00 - 17:30: A/C Access
  • 13:00: Daily brief in lab
  • 13:30: Egress training
  • WAS window plate and inlet to be installed
Other notes:
  • Please sign in on arrival to the instrument lab, and sign out when leaving for the day. There is a clipboard hanging by the entrance.
  • If you are bringing drinks into the cabin, please only use containers with spill proof lids. No coffee cups, soft drink cups, etc.