Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
27 |
28 |
29 |
30 |
|||
«
Aircraft Engineering Modifications
2011-09-19 - 2012-03-23
»
|
||||||
«
Aircraft Configuration
2011-11-16 - 2012-01-19
»
|
||||||
«
Integration for Fault detection in Surprise Valley, CA - Jonathan Glen
2011-11-21 - 2012-01-20
»
|
||||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
N928 Minor Ops Inspection
2011-09-11 - 2012-03-23
»
|
||||||
«
Annual Maintenance and Upgrades
2011-09-26 - 2012-01-06
»
|
||||||
«
Phase Inspection
2011-11-01 - 2011-11-30
|
NAIMS download
2011-12-01 - 2011-12-02
|
|
||||
«
Phase Inspection
2011-11-01 - 2011-12-01
|
|
|
||||
«
Maintenance
2011-11-22 - 2011-11-30
|
|
|
|
|||
«
NAIMS
2011-11-14 - 2011-11-28
|
|
|
|
|
|
|
«
NAIMS
2011-11-14 - 2011-11-30
|
|
|
|
|||
«
N926 DEPLOYMENT
2011-11-15 - 2012-02-01
»
|
||||||
«
Non-flyable storage
2011-01-01 - 2011-12-31
»
|
||||||
|
Routine Maintenance
2011-11-28 - 2012-01-08
»
|
|||||
MR-TCDL, Grnd functional checkout
2011-11-28 - 2011-12-16
»
|
||||||
|
|
|
||||
«
Aircraft Engineering Modifications
2011-09-19 - 2012-03-23
»
|
||||||
«
Aircraft Configuration
2011-11-16 - 2012-01-19
»
|
||||||
«
Integration for Fault detection in Surprise Valley, CA - Jonathan Glen
2011-11-21 - 2012-01-20
»
|
||||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
N928 Minor Ops Inspection
2011-09-11 - 2012-03-23
»
|
||||||
«
Annual Maintenance and Upgrades
2011-09-26 - 2012-01-06
»
|
||||||
«
Routine Maintenance
2011-11-28 - 2012-01-08
»
|
||||||
«
N926 DEPLOYMENT
2011-11-15 - 2012-02-01
»
|
||||||
«
MR-TCDL, Grnd functional checkout
2011-11-28 - 2011-12-16
»
|
||||||
«
Non-flyable storage
2011-01-01 - 2011-12-31
»
|
||||||
|
GLEAM systems check flights
2011-12-05 - 2011-12-09
|
|
||||
FMS/Data Mgmt System Upgrades
2011-12-05 - 2011-12-23
»
|
||||||
NAIMS download
2011-12-05 - 2011-12-13
»
|
||||||
|
|
|||||
«
Aircraft Engineering Modifications
2011-09-19 - 2012-03-23
»
|
||||||
«
Aircraft Configuration
2011-11-16 - 2012-01-19
»
|
||||||
«
Integration for Fault detection in Surprise Valley, CA - Jonathan Glen
2011-11-21 - 2012-01-20
»
|
||||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
N928 Minor Ops Inspection
2011-09-11 - 2012-03-23
»
|
||||||
«
Annual Maintenance and Upgrades
2011-09-26 - 2012-01-06
»
|
||||||
«
Routine Maintenance
2011-11-28 - 2012-01-08
»
|
||||||
«
N926 DEPLOYMENT
2011-11-15 - 2012-02-01
»
|
||||||
«
MR-TCDL, Grnd functional checkout
2011-11-28 - 2011-12-16
|
|
|||||
«
FMS/Data Mgmt System Upgrades
2011-12-05 - 2011-12-23
»
|
||||||
«
NAIMS download
2011-12-05 - 2011-12-13
|
|
|
|
|
||
«
Non-flyable storage
2011-01-01 - 2011-12-31
»
|
||||||
|
Maintenance
2011-12-12 - 2012-01-03
»
|
|||||
Functional Check Flights
2011-12-12 - 2011-12-21
»
|
||||||
Piot Profs
2011-12-12 - 2011-12-14
|
|
|
|
|||
|
GCPEX Instrument Integration
2011-12-13 - 2012-01-08
»
|
|||||
|
|
|
|
|||
«
Aircraft Engineering Modifications
2011-09-19 - 2012-03-23
»
|
||||||
«
Aircraft Configuration
2011-11-16 - 2012-01-19
»
|
||||||
«
Integration for Fault detection in Surprise Valley, CA - Jonathan Glen
2011-11-21 - 2012-01-20
»
|
||||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
N928 Minor Ops Inspection
2011-09-11 - 2012-03-23
»
|
||||||
«
Annual Maintenance and Upgrades
2011-09-26 - 2012-01-06
»
|
||||||
«
Routine Maintenance
2011-11-28 - 2012-01-08
»
|
||||||
«
Maintenance
2011-12-12 - 2012-01-03
»
|
||||||
«
Functional Check Flights
2011-12-12 - 2011-12-21
|
|
Annual Maintenance
2011-12-23 - 2012-02-24
»
|
||||
«
N926 DEPLOYMENT
2011-11-15 - 2012-02-01
»
|
||||||
«
FMS/Data Mgmt System Upgrades
2011-12-05 - 2011-12-23
|
|
|||||
«
GCPEX Instrument Integration
2011-12-13 - 2012-01-08
»
|
||||||
«
Non-flyable storage
2011-01-01 - 2011-12-31
»
|
||||||
|
Deployment to Yuma, AZ
2011-12-19 - 2011-12-21
|
|
|
|
||
|
|
|
||||
«
Aircraft Engineering Modifications
2011-09-19 - 2012-03-23
»
|
||||||
«
Aircraft Configuration
2011-11-16 - 2012-01-19
»
|
||||||
«
Integration for Fault detection in Surprise Valley, CA - Jonathan Glen
2011-11-21 - 2012-01-20
»
|
||||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
N928 Minor Ops Inspection
2011-09-11 - 2012-03-23
»
|
||||||
«
Annual Maintenance and Upgrades
2011-09-26 - 2012-01-06
»
|
||||||
«
Routine Maintenance
2011-11-28 - 2012-01-08
»
|
||||||
«
Maintenance
2011-12-12 - 2012-01-03
»
|
||||||
«
Annual Maintenance
2011-12-23 - 2012-02-24
»
|
||||||
«
N926 DEPLOYMENT
2011-11-15 - 2012-02-01
»
|
||||||
«
GCPEX Instrument Integration
2011-12-13 - 2012-01-08
»
|
||||||
«
Non-flyable storage
2011-01-01 - 2011-12-31
|
||||||
|
|
|
|
|
|
|