Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

April 2011

Sun Mon Tue Wed Thu Fri Sat
27
28
29
30
31
1
2
« Maintenance / Engineering Mod #3 2011-03-01 - 2011-06-27
»
« NADIR port installation 2011-03-07 - 2011-09-09
»
« Non-flyable storage 2011-01-01 - 2011-12-31
»
 
Autopilot Modifications 2011-03-28 - 2011-08-13
»
OIB Greenland 2011-03-28 - 2011-05-20
»
ICE Ax 2011-03-28 - 2011-04-07
»
Fabricate/Upload G-LiHT 2011-03-28 - 2011-04-29
»
 
 
 
 
Nadir Port Modification 2011-04-01 - 2011-06-30
»
 
 
3
4
5
6
7
8
9
 
N928 DEPLOYMENT 2011-04-04 - 2011-09-10
»
 
CARVE Mission 2011-04-04 - 2011-07-01
»
 
Reimbursable Flight Mission 2011-04-04 - 2011-04-08
 
 
 
Maintenance and Upgrades 2011-04-04 - 2011-04-29
»
 
CALIPSO Night Cal/Val 2011-04-04 - 2011-04-08
 
 
 
APCS 2011-04-04 - 2011-04-08
 
 
 
APCS 2011-04-04 - 2011-07-01
»
 
MACPEX 2011-04-04 - 2011-04-29
»
 
AVIRIS Mission 2011-04-04 - 2011-07-31
»
 
UAVSAR pods 2011-04-04 - 2011-04-08
 
 
 
OIB upload 2011-04-04 - 2011-04-08
 
 
« Maintenance / Engineering Mod #3 2011-03-01 - 2011-06-27
»
« Autopilot Modifications 2011-03-28 - 2011-08-13
»
« OIB Greenland 2011-03-28 - 2011-05-20
»
« NADIR port installation 2011-03-07 - 2011-09-09
»
« Non-flyable storage 2011-01-01 - 2011-12-31
»
« Nadir Port Modification 2011-04-01 - 2011-06-30
»
« ICE Ax 2011-03-28 - 2011-04-07
 
 
 
Hawaii Deployment 2011-04-03 - 2011-04-06
 
 
 
 
« Fabricate/Upload G-LiHT 2011-03-28 - 2011-04-29
»
 
 
 
 
 
« Maintenance / Engineering Mod #3 2011-03-01 - 2011-06-27
»
« Autopilot Modifications 2011-03-28 - 2011-08-13
»
« OIB Greenland 2011-03-28 - 2011-05-20
»
« N928 DEPLOYMENT 2011-04-04 - 2011-09-10
»
« CARVE Mission 2011-04-04 - 2011-07-01
»
« NADIR port installation 2011-03-07 - 2011-09-09
»
« Non-flyable storage 2011-01-01 - 2011-12-31
»
« Nadir Port Modification 2011-04-01 - 2011-06-30
»
« Maintenance and Upgrades 2011-04-04 - 2011-04-29
»
« APCS 2011-04-04 - 2011-07-01
»
« MACPEX 2011-04-04 - 2011-04-29
»
« AVIRIS Mission 2011-04-04 - 2011-07-31
»
« Fabricate/Upload G-LiHT 2011-03-28 - 2011-04-29
»
MABEL, CATS & CPL Download 2011-04-11 - 2011-04-12
 
OIB 2011-04-13 - 2011-05-10
»
806 Seat Inspection 2011-04-11 - 2011-04-15
 
 
ATC Upgrade 2011-04-11 - 2011-05-13
»
Reimbursable Download 2011-04-11 - 2011-04-15
 
 
IIP Broadband Lidar instrument upload 2011-04-11 - 2011-04-22
»
 
 
Sea Eddies 2011-04-14 - 2011-04-16
 
 
 
« Maintenance / Engineering Mod #3 2011-03-01 - 2011-06-27
»
« Autopilot Modifications 2011-03-28 - 2011-08-13
»
« OIB Greenland 2011-03-28 - 2011-05-20
»
« N928 DEPLOYMENT 2011-04-04 - 2011-09-10
»
« CARVE Mission 2011-04-04 - 2011-07-01
»
« NADIR port installation 2011-03-07 - 2011-09-09
»
« Non-flyable storage 2011-01-01 - 2011-12-31
»
« Nadir Port Modification 2011-04-01 - 2011-06-30
»
« Maintenance and Upgrades 2011-04-04 - 2011-04-29
»
« APCS 2011-04-04 - 2011-07-01
»
« ATC Upgrade 2011-04-11 - 2011-05-13
»
« MACPEX 2011-04-04 - 2011-04-29
»
« AVIRIS Mission 2011-04-04 - 2011-07-31
»
« OIB 2011-04-13 - 2011-05-10
»
« Fabricate/Upload G-LiHT 2011-03-28 - 2011-04-29
»
« IIP Broadband Lidar instrument upload 2011-04-11 - 2011-04-22
 
 
 
BAS Integration 2011-04-18 - 2011-05-01
»
Download CALIPSO (HSRL & ACAM) 2011-04-18 - 2011-04-22
 
 
MC3E Instrument Flight 2011-04-18 - 2011-04-20
 
 
 
 
 
« Maintenance / Engineering Mod #3 2011-03-01 - 2011-06-27
»
« Autopilot Modifications 2011-03-28 - 2011-08-13
»
« OIB Greenland 2011-03-28 - 2011-05-20
»
« N928 DEPLOYMENT 2011-04-04 - 2011-09-10
»
« CARVE Mission 2011-04-04 - 2011-07-01
»
« NADIR port installation 2011-03-07 - 2011-09-09
»
« BAS Integration 2011-04-18 - 2011-05-01
»
« Non-flyable storage 2011-01-01 - 2011-12-31
»
« Nadir Port Modification 2011-04-01 - 2011-06-30
»
« Maintenance and Upgrades 2011-04-04 - 2011-04-29
 
 
« APCS 2011-04-04 - 2011-07-01
»
« ATC Upgrade 2011-04-11 - 2011-05-13
»
« MACPEX 2011-04-04 - 2011-04-29
 
 
« AVIRIS Mission 2011-04-04 - 2011-07-31
»
« OIB 2011-04-13 - 2011-05-10
»
« Fabricate/Upload G-LiHT 2011-03-28 - 2011-04-29
 
 
 
Costa Rica Deployment 2011-04-25 - 2011-04-28
 
 
Upload AID for ASCENDS 2011-04-25 - 2011-04-29