Disclaimer: This material is being kept online for historical purposes. Though accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers. Visit https://espo.nasa.gov for information about our current projects.

 

2014-08-01

Overview:

   AV-6 “CST” on Monday (see Schedule below)

   Dry Run starts on Monday (see Schedule below)

Today’s Accomplishments:

   AV-6 Preflight activity

No activity Saturday - Sunday

Outlook Next Week:

   Monday (4Aug): AV-6 CST (all times PDT):

   o   0745: Pre-Brief Mtg. (see email for conference number)

   o   0830: Crew & P.I.’s staff GHOC

       -  (1130 EDT: GHOC-E Payload Team Staffing)

       -  GHOC to GHOC-E Comm’s (see email for conference number)

   o   0930: Engine Start

       -  Expect CST to take ~2 hours

 Dry Run (Starts: 4Aug - continues through 15Aug):

            0800 PDT (1100 EDT)

            (see email for conference number)

Tuesday (5Aug): AV-6 Preflight of Inst’s/Aircraft

Wednesday (6Aug): AV-6 HS3 Range Flight

 

Thursday (7Aug): Backup date for AV-6 Range Flight

2014-07-31

Overview:

   AV-6 Ready for “CST” on Monday (see CST Schedule below)

   AV-1 Ready for Science Team’s return on 11Aug

 Today’s Accomplishments:

   AV-6 Data-IT activity

    o   Ku testing with HS3’14 Ku Transmission Plan

   HDVis Environmental Lab Test successful

   HDVis lens refocus / camera reassembly

The Plan for Tomorrow (Friday):

   0730: GH Leads Mtg in Payload Cage

   GH Crew begins AV-6 CST Preflight activity

   No AV-6 Science/P.I. Activity at AFRC/WFF

   No HS3 Daily Status Report will be issued tomorrow.

 Outlook Next Week:

   Monday (4Aug): AV-6 CST (all times PDT):

    o   0745: Pre-Brief Mtg. (see email for phone #)

    o   0830: Crew & P.I.’s staff GHOC

      -  1130 EST: GHOC-E Payload Team Staffing

      -  GHOC to GHOC-E Comm (see email for phone #)

    o   0930: Engine Start

      -  Expect CST to take ~2 hours

 Tuesday (5Aug): AV-6 Preflight of Inst’s/Aircraft

 Wednesday (6Aug): AV-6 HS3 Range Flight

 

 Thursday (7Aug): Backup date for AV-6 Range Flight

2014-07-30

Overview:

    AV-1 Ready for CST – Science Team’s on scheduled break from AFRC/WFF

    AV-6 Ready for CST (pic)

 

Today’s Accomplishments:

    AV-6 Data-IT activity

    o   S-HIS Pre-flight complete for CST

    o   All instruments are now ready for CST

    AV-1 Data-IT activity (Link Mod) (pic)

    HDVis setup in Environmental Lab

    Visiting Teachers tour

The Plan for Thurs (all times PDT):

   0600: HDVis Enviro Lab Testing

   0630: AV-6 outdoors w/power for Ku Transmission Plan Test

   0730: GH Leads Mtg in Payload Cage

   No AV-6 Science/P.I. Activity on Aircraft

 

Outlook:

    Friday:

    o   AV-6 Aircraft Preflight activity

    o   No AV-6 Science/P.I. activity

    Monday (4Aug): AV-6 CST (all times PDT):

     o   0745: Pre-Brief Mtg.

     o   0830: Crew & P.I.’s staff GHOC and GHOC-E

     o   0930: Engine Start for CST

          -  Expect CST to take ~2 hours

    Tuesday (5Aug): AV-6 Preflight of Inst’s/Aircraft

    Wednesday (6Aug): AV-6 HS3 Range Flight

 

    Thursday (7Aug): Backup date for AV-6 Range Flight

2014-07-29

Overview:

AV-1 Ready for CST – Science Team’s on scheduled break from AFRC/WFF

AV-6 ahead of schedule

 

Today’s Accomplishments:

AV-6 Pre-CST passed 

o   S-HIS removed, and re-installed for Avionics maintenance

o   CPL Pre-flight complete for CST

o   AVAPS Pre-flight complete for CST

AV-1 Maintenance

HS3’14 Tech Brief – Flight Approval signed

New flat-lens extension of HDVis delivered


The Plan for Wed (all times PDT):

0730: GH Leads Mtg in GH Cage

0800: AV-6 Power in Hangar Testing

o   S-HIS Data-IT Test

o   S-HIS Pre-flight for CST

~1000: AV-1 Power in Hangar

o   Data-IT activity with LinkMod

HDVis Camera Bench Testing with new Flat-lens addition to Pressure Box

 

Outlook:

Thursday:

o   Science ready for CST, no science inst. activity at AFRC or WFF

o   Environmental Test of HDVis

o   WFF COMSEC VITS @ AFRC

Friday: No HS3 Science inst. activity planned at AFRC or WFF

Monday (4Aug): AV-6 CST (all times PDT):

o   0745: Pre-Brief Mtg.

o   0830: Crew & P.I.’s staff GHOC and GHOC-E

o   0930: Engine Start for CST

§  Expect CST to take ~2 hours

Tuesday (5Aug): AV-6 Preflight of Inst’s/Aircraft

Wednesday (6Aug): AV-6 HS3 Range Flight

2014-07-28

Overview:

   AV-1 Ready for CST – Science Team’s on scheduled break from AFRC/WFF

   AV-6 Integ. on schedule

Today’s Accomplishments:

   AV-6 Outdoor Testing

    o   S-HIS - complete (pic)

    o   CPL - complete

    o   AVAPS - in work

  AV-1 Maintenance (pic)

The Plan for Tuesday (all times PDT):

   0630: AV-6 Outdoors with Power

    o   0630: AVAPS power-on with support from WFF

        - AVAPS @ WFF support at 0930 EDT

    o   Primary initial GH Data-IT Activity will be with:

        - GHIS

         -Camera Systems

After Data-IT completes their initial activity with core systems - they WILL want to commence additional testing to possibly include Combined Instrument Testing... So S-HIS and CPL Teams should plan on supporting the continuation of AFRC and WFF GHOC-E test activity starting at ~0730 PDT (1030 EDT). Time to be determined by the Data-IT Team.

    o   1500: Power-down aircraft

    0800: HS3 Tech Brief

Outlook:

    Wed: AV-6 Outdoor Testing continues

    o   Possible Pre-CST

   Thursday: AV-6 Pre-CST

   Friday: Contingency

2014-07-25

Overview:

    AV-1 Integration/Test completed on schedule – ready for CST-prep on 11Aug

    AV-6 Integ. on schedule – Outdoor Satcom testing w/WFF starts Monday

 Today’s Accomplishments:

    AV-1 Science Integ/Test activity ends

    o   HIWRAP data-file download

    o   Aircraft jacked for gear maint. (pic)

    o   Science Flight-prep starts: Monday, 11Aug (see below note)

    AV-6 Wt & Balance

    o   CPL power harness expanded to EIP-4

    o   CPL Testing completed

    Completed Daylight Nose Cam relocation

The Plan for Saturday:

    AV-6 Avionics harness tie-down activity, No Power on Aircraft

Outlook:

    Monday @ AFRC: AV-6 Outdoor Testing (all times PDT):

    o   0600 – 0900: Aircraft fueling

    o   1000 – 1200: Power-on, Data-IT Network/System Configuration

    o   1200 – ~1430: PI’s support Satcom Testing of Inst’s w/GHOC-E

    Monday @ WFF: AV-6 Support in GHOC-E (all times EDT):

    o   0830: Badging, if needed

    o   0900: Scan Laptops, if required

    o   0930: COMSEC Briefing

    o   1000: Software download/install, if required

    o   1200: Lunch (yum)

    o   1400 – 1500: Be available (in case IT ready to start Satcom early)

    o   1500 - ~1730: PI’s in GHOC-E for Inst. Satcom Testing

    Tues-Wed: Continue outdoor testing w/GHOC-E

    Thurs: Pre-CST

    Monday Aug-11th Special Note to AV-1 Teams:

    o   AFRC: 0630 PDT: HIRAD req’d for Install in GH Hangar

         0800: HAMSR & HIRAD PI’s Support Data-IT Retest (HIWRAP too, if desired)

    o   WFF: Need to AV-1 PI’s TBD (AFRC Testing may only be in Hangar)

 

         Continue to monitor this Daily Msg. for info

2014-07-24

Overview:

AV-1 and AV-6 integration and testing is on schedule.

 

Today’s Accomplishments:

AV-1 HIRAD RF Test complete

o   HIWRAP waveform refinement activity

o   HIRAD & HAMSR removal for camera work & A/C maint.

AV-6 Hangar IT Testing

o   AVAPS Testing complete

o   S-HIS Testing complete

o   CPL Installed and Testing in work

H.S. Student visit

 

The Plan for Friday (all times PDT):

AV-6  Wt. & Balance

o   AV-6 Hangar IT Testing (CPL) in PM

AV-1 HIWRAP testing (PI request)

o   Camera Data-IT Testing

 

Outlook:

Saturday Avionics activity on AV-6 (No Power on Aircraft)

Monday @ AFRC: AV-6 Outdoor Testing

o   Schedule TBD (PIs should be present starting at 0830)

Monday @ WFF:

o   0730: Badging, if needed

o   0800: Scan Laptops

o   0930: COMSEC Briefing

o   1000 – 1100: Software Downloads/installs, if required

o   1100 – 1130: Eat Lunch 

o   1130: Begin Satcom Testing in GHOC-E

Special Monday Aug-11th Note to AV-1 Teams:

o   AFRC: 0630 Outdoor Testing of aircraft (PI’s support req’d)

o   WFF: 0930 GHOC-E Support (HIRAD, HIWRAP, HAMSR PI’s needed)

2014-07-23

Overview:

AV-1 and AV-6 integration and testing is on schedule.

 

Today’s Accomplishments:

AV-1 passed Pre-CST

AV-6 integration activity started

o   S-HIS – ready for Hangar IT Testing

o   AVAPS – Installation complete, function testing complete

o   CPL – SIL Bench completed, Zone-7 installed

§  Zone-3 installation ready (holding for camera work in area)

Japanese Film Crew for HS3 visits GH Hangar


The Plan for Thursday (all times PDT):

AV-1 HIRAD RF Test:

o   0645 Pretest Tag-up 

o   0700 - 0900 Test 

AV-1 Deintegration of HIRAD and HAMSR

o   To support next week’s Camera Daylight Cam work & Gear Maint

AV-6 Hangar IT Testing:

o   0700: Daylight Cam installation

o   0800: CPL Zone-3 Installation

o   0900 - ?: Hangar IT Testing

1000: COMSEC WFF (by VITS) Briefing for AFRC personnel

 

The Plan for Friday:

AV-1: Data-IT work with Cameras (Fratello)

o   No PI activity scheduled

AV-6: Wt/Balance

o   No PI activity scheduled

 

Outlook:

No Sat/Sun activity scheduled

Monday @ AFRC: AV-6 Outdoor Testing

o   Schedule TBD (PI’s should be present starting at 0830)

Monday @ WFF:

o   0730: Badging, if needed

o   0800: Scan Laptops

o   0930: COMSEC Briefing

o   1000 – 1100: Software Downloads/installs, if required

o   1100 – 1130: Eat Lunch 

o   1130: Begin Satcom Testing in GHOC-E

2014-07-22

Overview:

   AV-1 Testing on schedule

   AV-6 Integration continues

Today’s Accomplishments:

   AV-1 Outdoor testing with GHOC-E participation (pic)

      o   HAMSR - complete

      o   HIRAD – complete

      o   HIWRAP – complete

   AV-6 integration activity started

      o   S-HIS – installed (pic)

      o   AVAPS – installed (pic)

      o   CPL – SIL Bench in work

The Plan for Wednesday is (all times PDT):

     0630 (0930 EDT): Aircraft outdoors with Power (GHOC-E support begins)

     0645: Pre-CST to begin (may be delayed, per Data-IT)

     0730: Payload Cage meeting of Leads

     0800: NHK Japanese Film Crew arrives in AFRC Hangar

     HIRAD RF Test: To be performed after Pre-CST, time/temp allowing

     Installation of CPL in AV-6

The Plan for Thursday is:

     WFF COMSEC Training at AFRC (Time TBA)

     AV-1: HIRAD RF Test (if not completed Wednesday

           o   HIRAD Removal per Aircraft Maint. required

     AV-6: Hangar Data-IT Testing

Outlook:

    AFRC:

          o   Friday: AV-1 TBD, AV-6 Wt/Bal

          o   No activity planned for Sat & Sun

2014-07-21

Overview:

AV-1 Testing on schedule

AV-6 Integration has begun

 

Today’s Accomplishments:

AV-1 Outdoor testing with GHOC-E participation

o   HAMSR - complete

o   HIRAD – continues tomorrow

o   HIWRAP repaired today – testing tomorrow

AV-6 integration activity started

o   S-HIS – SIL Bench Complete

o   AVAPS – SIL Bench in work

o   CPL – expected tomorrow


The Plan for Tuesday is (all times PDT):

0730: Payload Cage meeting of Leads and PI’s

0800: AV-1 Aircraft taken outdoors

0830 (1130 EDT): Testing & GHOC-E Support begins in this order:

o   HIWRAP

o   HIRAD

o   Facility Instruments

Installation of S-HIS and AVAPS in AV-6

 

The Plan for Wednesday is:

AV-1 Outdoor Testing to continue as needed

AV-6 Integration of CPL

 

Outlook:

AFRC:

o   Thursday: AV-1 Pre-CST (Possible HIRAD Test), AV-6 Hangar IT

o   Friday: AV-1 HIRAD Testing, AV-6 Wt/Bal

WFF:

o   Thursday: Support AV-1 Pre-CST (possible HIRAD Testing)

o   Friday: Support HIRAD Testing